PRB Funnel and Gate System Norris Sucker Rods Plant
Significant Project Features: Approximately 150LF of Permeable Reactive Barrier (PRB) installed to a max depth of 11 ft. Approximately 950LF of Soil-Bentonite Installed to a
Significant Project Features: Approximately 150LF of Permeable Reactive Barrier (PRB) installed to a max depth of 11 ft. Approximately 950LF of Soil-Bentonite Installed to a

Background In 2021, Syncrude Canada Ltd (Syncrude) was constructing a new tailings dam at the South In-Pit Pond at its North Mine near Fort McMurray,

Project Description: The purpose of this project was to construct a Soil-Bentonite (SB) cut-off wall for the Ramona Municipal Water District as part of the

Project Features: Soil-Bentonite Barrier Wall 48,476 Linear Feet (LF). 1,446,362 Vertical Square Feet. Maximum of 60-feet deep Target Average Permeability of 1 x 10-7 cm/s

Background Freeport-McMoRan, a large copper mining company, tasked GSI with creating an impermeable cutoff wall / grout curtain at their Chino Mine facility to prevent

Significant Project Features: Soil-Bentonite Slurry Wall 1,733 Linear Feet, 66,600 Square Feet, Maximum of 48-feet deep Target Average Permeability of 1 x 10-7 cm/s 100 %

Significant Project Features: Soil-Bentonite Cutoff Wall Total Area: 168,700 SF Length: 2,410.0 LF Depth: 70 ft. Width: 3 ft. Permeability: <1.0×10-7 cm/sec Project Objective: To install
Background: The McIntosh Pit is a former uranium mine that has been undergoing a multi-phase reclamation. The previous mining operations and deposit of tailings created

This project involved construction of a soil-bentonite (SB) hydraulic barrier wall along a property boundary to a future warehouse facility located between wetlands and a

Geo-Solutions was contracted to excavate a Soil-Bentonite (SB) cutoff wall along the toe of the Cypress Creek levee system. Our team successfully completed the project