Cutoff Walls South Florida Water Management Project Geo-Solutions constructed a five-mile-long Cement-Bentonite (CB) cutoff wall along an existing levee, completed excavation with depths up to 65 feet below the existing ground surface, Read More »
Cutoff Walls MGP Site SCCB Slurry Wall and Jet Grouting The jet grouting included over 15,000 vertical square feet of wall with columns ranging from 4 to 6 feet in diameter. Columns depths ranged from Read More »