Source Area Soil Thermal Treatment
Significant Project Features: Thermal treatment of 35 columns of impacted soil via large diameter auger steam injection Injection of approximately 45,000 lbs. of Zero-Valent Iron

Significant Project Features: Thermal treatment of 35 columns of impacted soil via large diameter auger steam injection Injection of approximately 45,000 lbs. of Zero-Valent Iron

Significant Project Features: • In-Situ Solidification (ISS) by method of bucket mixing, with a 16% addition rate of Type I/II Portland Cement to solidify/stabilize the

Significant Project Features: Steam stripping with 9-foot diameter auger to depths of 16 feet below ground followed by soil mixing with zero-valent iron, both to

Significant Project Features: Soil-Bentonite Slurry Wall 1,733 Linear Feet, 66,600 Square Feet, Maximum of 48-feet deep Target Average Permeability of 1 x 10-7 cm/s 100 %

Project Background: Geo-Solutions, Inc. (GSI) was hired by Creamer Environmental to perform the In-Situ Stabilization (ISS) of approximately 49,100 cubic yards of contaminated soils at

The project included remediation of a portion of the Lancaster manufactured gas plant site. Specifically, the project involved closure of two former gas holders. After

Crawford Station is a former manufactured gas plant located in Chicago, IL. For remediation, Geo-Soluctions was tasked with in-situ solidification (ISS) of contaminated soils, among

Geo-Solutions was contracted to complete the closure of a former ash pond where the primary means of addressing CCR materials was by way of in-situ

For this site cleanup project of a former manufactured gas plant, Geo-Solutions was responsible for all elements of the project including site preparation and controls,

Geo-Solutions served as the primary contractor for this manufactured gas plant remediation project. As such, our team was responsible for all project elements, including site