Slurry cutoff walls are nonstructural barriers constructed to intercept and impede the flow of fluids underground. There are two basic types of slurry cutoff walls, soil-bentonite (SB) and cement-bentonite (CB). Depending on the nature of the project, either method may have some technical or economic advantage over the other. In both cases, a narrow trench is excavated into the ground using a backhoe or other more specialized equipment. The trench is prevented from collapsing by keeping it full at all times with bentonite slurry similar to drilling mud. In the case of SB walls, the trench is subsequently backfilled with a mixture of soil and bentonite slurry that forms the permanent impervious cutoff wall. With the CB method, cement is added to the slurry, which later sets up, forming the permanent seepage barrier.
Strength and Permeability of a Deep Soil Bentonite Slurry Wall
In 2006, a Soil Bentonite (SB) slurry wall was constructed at a brownfield redevelopment of a former steel mill site in Mayfield, NSW Australia. At this site, the slurry wall is designed to block groundwater