Slurry cut-off walls are non-structural barriers constructed to intercept and impede the flow of fluids underground. There are two basic types of slurry cut-off walls, soil-bentonite (SB) and cement-bentonite (CB). Depending on the nature of the project, either method may have some technical or economic advantage over the other. In both cases, a narrow trench is excavated into the ground using a backhoe or other more specialized equipment. The trench is prevented from collapsing by keeping it full at all times with bentonite slurry similar to drilling mud. In the case of SB walls, the trench is subsequently backfilled with a mixture of soil and bentonite slurry that forms the permanent impervious cut-off wall. With the CB method, cement is added to the slurry which later sets up, forming the permanent seepage barrier.
In Situ Remediation Using Soil Mixing
Soil mixing, originally developed as a means for structural soil improvement, has evolved into a system for effectively treating soil in situ to meet environmental remediation cleanup objectives. Using soil mixing in remedial efforts has