JET GROUTING TO CONSTRUCT A SOLDIER PILE WALL USING A TWIN STEM SYSTEM
An existing coal loading pier located in Norfolk, Virginia was completed in 1961 for the purpose of loading ocean going ships with coal for export
An existing coal loading pier located in Norfolk, Virginia was completed in 1961 for the purpose of loading ocean going ships with coal for export
Stabilization treatment applied using jet-grouting techniques was identified as a preferred remedy for soils contaminated with elevated concentrations of cadmium at an industrial site located
The material presented in this publication has been prepared in accordance with generally recognized engineering principles and practices, and is for general information only. This
A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that
Work was completed in early 1992 to clean up a 5.5 acre (2.2 ha) stormwater sludge basin for an oil refinery company. The basin, which
(This technical specification is to be used to guide the writer in the contract requirements for Soilcrete Stabilization via Jet Grouting construction for a specific

The project included remediation of a portion of the Lancaster manufactured gas plant site. Specifically, the project involved closure of two former gas holders. After

The jet grouting included over 15,000 vertical square feet of wall with columns ranging from 4 to 6 feet in diameter. Columns depths ranged from