Significant Project Features: • In-Situ Solidification (ISS) by method of bucket mixing, with a 16% addition rate of Type I/II Portland Cement to solidify/stabilize the
Significant Project Features: Excavation of approximately 40,000 CY of soil and debris In-situ solidification of 47,000 CY MGP impacted soil through clayey soils Site preparation