An underground diesel fuel spill at a county bus maintenance facility in San Jose, California was successfully remediated by constructing a pair of 50 feet
Significant Project Features: Installation of 1,850 linear feet of sand filter trench using the bio-polymer slurry trench method Use of guar gum for slurry creation
Significant Project Features: In-situ solidification (ISS) of approximately 13,900 CY Hex-Chromium impacted soil via bucket mixing. Permeable Reactive Barrier approximately 300 LF and over 9,600
Project Objectives Geo-Solutions, Inc. (GSI) was subcontracted by Code Environmental Services, Inc. (Code) who was contracted by Akzo Nobel to install the groundwater collection trench.