Innovative Use of Bio-Polymers to Construct a Toe Drain at Piute Dam

The presence of an original unfiltered drain and liquefiable embankment and alluvial soils near the toe of 100-year-old Piute Dam in Utah led project owner Piute Reservoir and Irrigation Co. to construct a new deep drain beneath the downstream portion of the dam. The company chose a bio-polymer trench method, which would allow placement of filter/drain materials and drain pipes without incurring the cost of a dewatering program and deep, open excavation.
Learn More

Get in Touch

Let’s chat about your next project.

Featured Case Studies

Scroll to Top

Can We Help You Find Something?