Significant Project Features: Thermal treatment of 35 columns of impacted soil via large diameter auger steam injection Injection of approximately 45,000 lbs. of Zero-Valent Iron
Significant Project Features: Steam stripping with 9-foot diameter auger to depths of 16 feet below ground followed by soil mixing with zero-valent iron, both to