Significant Project Features: Approximately 150LF of Permeable Reactive Barrier (PRB) installed to a max depth of 11 ft. Approximately 950LF of Soil-Bentonite Installed to a
Significant Project Features: In-situ solidification (ISS) of approximately 13,900 CY Hex-Chromium impacted soil via bucket mixing. Permeable Reactive Barrier approximately 300 LF and over 9,600
Project Objectives Geo-Solutions, Inc. (GSI) was subcontracted by Code Environmental Services, Inc. (Code) who was contracted by Akzo Nobel to install the groundwater collection trench.