New York Site Remediation Project

New York Site Remediation Project

Project Description

The ISS included the stabilization of approximately 240,000 CY of impacted soil.  The 31 acre site was divided into approximately 4,400 cell measuring 20-feet wide by 15-feet long.  The ISS achieved a maximum depth of 16-feet below ground surface with an average depth of 6-feet below ground surface.