Manakin-Sabot, VA: James River Wetland Mitigation Landbank Phase II

wetlands-construction-james-river-va

Phase II of this project involved converting another 50-acres of cultivated farmland into wetlands for the James River Mitigation Landbank. The site is bordered to the south by the James River and to the west by Genito Creek, and lies within the floodplain of the James River. Converting the site into a wetland required extensive earthwork and grading of the entire 50 acres of land. In total, approximately 50,000 cubic yards of soil were moved to create ponds, channels and uplands. Common phasing of the project included topsoil stripping, relocation of silty/clayey loam material, followed by topsoil replacement. The sandy soil, as well as any extra silty/clayey loam material requiring relocation, was placed along the banks of the James River and Genito Creek creating an area known as a riparian buffer. The buffer is several feet higher than the inner wetland region and was designed to control water inflow/outflow for the site. The final phasing of the project included stream restoration and seeding.

Equipment used to perform the soil excavation and relocation included self-loading pans, as well as excavators and trucks. Due to moist site conditions most of the fine grading work was performed using (six-way blade) bulldozers.

Grading was controlled by using several types of grade lasers, including both flat and dual slope lasers. Targets were attached to the equipment and set to grade for each varying region. Extensive QA/QC was performed throughout the project using conventional survey equipment, such as a total station transit, to layout perimeters of ponds and uplands as well as for grade verification and data collection. Grading tolerances, as stated in the specifications, were within +/- 0.1 ft.



 
   

Corporate Headquarters: 1250 Fifth Avenue • New Kensington, PA 15068 • 724-335-7273

© 2014

Geo-Solutions Facebook Geo-Solutions
Facebook
Geo-Solutions Linkedin Geo-Solutions
Linkedin
Geo-Solutions Canada Canada
Geo-Solutions
Geo-Solutions YouTube Geo-Solutions
YouTube
Geo-Solutions YouTube Geo-Solutions
Google +