Geo-Solutions
 
  EVENTS
NEWS
REQUEST INFO
HOME
EMPLOYEES

SPEAK WITH OUR EXPERTS: 724-335-7273

 
Geo-Solutions
WHO WE ARE WHAT WE DO HEALTH & SAFETY TECHNICAL RESOURCES CONTACT US
Geo-Solutions
 
 
Slurry Walls Soil Mixing Bio-Polymer Trenches Permeable Reactive Barriers Grouting MGP Sites Levee/Dam Reinforcement & Repair Wetlands
 

Collection


Georgetown, DE: Site Remediation, MGP Site

mgp-collection-georgetown-de

Geo-Solutions Inc. completed a site remediation project at a former MGP site in Georgetown, Delaware. The site was small and located within the city limits of Georgetown. Special concern of the client was the close proximity (8 feet) of the proposed excavation area from a cold storage food warehouse where differential settlement could adversely impact the operations. Additionally, a completion date of April 30, 2001 was mandatory as warehouse operations commenced on May 1, 2001. Geo-Solutions was chosen for its retention wall approach of using a concrete diaphragm wall system which would minimize horizontal deflections and eliminate vibration concerns.

Initial work consisted of several buildings and former gas holder foundation removal, which involved approximately 150 tons of materials. A 2 ft wide, 10 ft deep diaphragm wall was installed which allowed for the successful removal of contaminated subsurface soils. A small offset excavator was used to excavate the trench, while bentonite slurry was simultaneously pumped and maintained in the trench during excavation. A truck-mounted drill rig preceded the excavator and augered 18-inch diameter holes through 22 feet of soil. The 23 holes were used to set the support columns and anchor them into 10 feet of virgin soil. Thereafter, 14 x 73 "H" beams spaced 10-15 ft from centers were placed into the holes. Upon trench completion, 3,000 psi concrete was pumped into the trench, displacing the slurry and creating the retention wall. The subsurface contaminated soils were excavated and directly loaded into trucks for disposal. Upon completion of back filling activities, final restoration was completed.

The project was completed on time with no movement of the cold storage warehouse foundations. Geo-Solutions managed a confined work area and community concerns successfully in order to execute this project with zero incidents.



 
   

Corporate Headquarters: 1250 Fifth Avenue • New Kensington, PA 15068 • 724-335-7273

© 2014

Geo-Solutions Facebook Geo-Solutions
Facebook
Geo-Solutions Linkedin Geo-Solutions
Linkedin
Geo-Solutions Canada Canada
Geo-Solutions
Geo-Solutions YouTube Geo-Solutions
YouTube
Geo-Solutions YouTube Geo-Solutions
Google +