Soil Bentonite Cut Off Wall Case Studies
Slurry Wall Construction Process
 |
Geo-Solutions has completed bentonite slurry wall and related underground construction projects
in over 30 states and 15 countries
. Here you can find specific examples of actual Geo-Solutions' underground construction projects involving bentonite slurry walls. These bentonite slurry wall project examples include details such as date, location, and project summaries. For more information on slurry wall or other forms of underground construction technology, contact Geo-Solutions by calling 724-335-7273.
A Chemical plant construction project consisted of Soil-Bentonite and Cement-Bentonite Slurry Wall Installation for a containment system. Learn more about the Containment system at Occidental Chemical Plant.
The Greeley Reservoir construction project consisted of the installation of a soil-cement-bentonite cutoff wall at a former gravel pit. Learn more about the Greeley Reservoir Soil-Cement-Bentonite Cutoff Wall.
The Ithaca project consisted of surrounding a radioactive waste dump site with a slurry wall and installing a capping system over the site to exclude groundwater. Learn more about the Cornell University Radioactive Waste Dump Slurry Wall .
The Kawasaki project consisted of the construction of a slurry wall to surround an oil refinery as a groundwater barrier. Learn more about the Oil Refinery Slurry Wall.
The Loxahatchee project consisted of the creation of a cutoff wall to prevent stored water contamination and to minimize stored water loss. Learn more about Palm Beach Aggregates Quarry Slurry Wall.
The Marysville, CA construction project consisted of the installation of a soil-bentonite cut-off wall. Learn more about the Marysville Soil-Bentonite Cut-Off Wall.
The Mayfield project, a challenging groundwater barrier, was one of the deepest, continuous installations of barrier walls in the world. Learn more about Soil Bentonite Wall at the Hunter River.
The North Arlington project consisted of slurry wall containment around a building debris landfill. Learn more about the Erie Landfill Remediation .
The Tempe Landfill construction project consisted of the installation of a soil-bentonite cutoff wall at a municipal landfill. Learn more about the Tempe Landfill soil bentonite cut off wall.
The L-8 Canal project consisted of the installation of a soil-bentonite slurry wall through an existing dike . Learn more about L-8 Canal Soil-Bentonite Slurry Wall.
The Yuba City construction project was actually a series of six large and different projects done to strengthen levees in the area north of Sacramento CA. Learn more about the US Army Corps of Engineers Levee Project.
Geo-Solutions Can Help
For more specific guidance as to how underground construction technologies such as soil bentonite cutoff walls can be applied to your project, please contact Geo-Solutions by calling 724-335-7273 and we will be happy to assist.
To view the additional underground construction case studies we offer online here at Geo-Solutions.com, click on the link below or to your left:
Call Us Today
For more information on soil bentonite cutoff walls or to hire our services for your project, call us at 724-335-7273.
|